Anglo Platinum South Africa, Bag House, ZAF

Rustenburg Base Metals Complex, Bag House Induced Draft Fan Optimization

Location:

Status:

Sector:

Rustenburg, South Africa

Mining and Heavy Industry

Completed

Project

Challenges

  • The Bag House Filter Plant filters supported by an 450kW induced draft fan. It operates 24/7, apart from short periods when the smelter in undergoing maintenance. The annual electricity cost is US$0.25M p.a.

Goals & Objectives

  • The primary objective was to develop a process redesign of the Bag House Filter Plant induced draft fan operation with a Variable Speed Drive to minimise its electricity use by allowing the fan speed to be reduced to match the batch cycle of the Anglo Converter with electricity reduction of 75%.

Solutions

Service provided

  • Energy Efficiency

  • Energy Management Software & IT Energy Modelling

  • Techno-Economic Modelling to establish the Business Case

  • Project Management

  • Measurement and Verification of Energy Saving

Results and Benefits 

Financial Results

  • 28% IRR

  • Capital Investment $0.35M

  • Annual Gross Savings $0.16M

  • 2.5% COGS

Technologies applied

  • Induced Draft Fan

  • Equipment Optimisation

  • Meter Technology

  • Online Electricity Dashboard

ESG Impact

  • 2,650 ton CO2 savings